Nath said that pitching would be done once the Water Resources Department completes the surface strengthening work. He informed that following the directive of the Deputy Commissioner, a speed breaker would be put up with a signboard 'drive cautiously' to prevent any accident. Executive Engineer, Water Resources, Subrata Das informed that though flood protection work in the downstream of Barak river has been going on, it has not affected the NH. However, he assured that repairing work would be carried out jointly with PWD (NH) soon.