Nagaon Road Circle, Nagaon invites tender for construction of road

Nagaon Road Circle, Nagaon invites tender for construction of road

The Superintending Engineer, PWD, Nagaon Road Circle, Nagaon, Assam on behalf of Governor of Assam invites the item rate bids in electronic tendering system for Balance work for construction of roads under Pradhan Mantri Gram Sadak Yojana, 2017-18, Batch-3 in the Districts of Morigaon for 1(One) number of package with estimated cost amounting to Rs. 28.227 Lakhs including their maintenance for five years from the eligible contractors registered with Public Works Department (Roads), Assam. (Non-registered bidders may submit bids; however, the successful bidders must get registered in appropriate class with appropriate authorities before signing the contract)

Date of release of Invitation for Bids through e-procurement: 19-08-2020

Availability of Bid Documents and mode of submission: The bid document is available online and should be submitted online in http://assamtenders.gov.in. The bidder would be required to register in the web-site which is free of cost. For submission of the bids, the bidder is required to have a valid Digital Signature Certificate (DSC) from one of the authorized Certifying Authorities. The bidders are required to submit (a) original Demand Draft towards the cost of bid document and (b) original bid security in approved form and (c) original affidavit regarding correctness of information furnished with bid document as per provisions of Clause 4.4 B (a) (ii) of ITB with Superintending Engineer, PWD, Nagaon Road Circle, Nagaon, on a date not later than three working days after the opening of technical qualification part of the Bid, either by registered post or by hand, failing which the bids shall be declared non-responsive.

Last Date/ Time for receipt of bids through e-procurement: 25-08-2020, 16.00 hours The Package wise details are as given below:

Sl no.

District

Package No

Name of work

Estimated Cost (Rs In Lakh) construction 

Estimated Cost (Rs In Lakh) Maintenance

Total Cost (Rs in lakhs)

Period of completion (in months)

1

Morigaon

AS-17-160

Balance work for Construction of road from Dekagaon to Zabbor Ali House including CD works and routine maintenance for 5 years under PMGSY 2017-18 Batch3

21/127

7.10

28.227

2

For further details please log on to http://assamtenders.gov.in.

Sd/-
Superintending Engineer, PWD
Nagaon Road Circle, Nagaon