Jobs in Rest of NE

SJVN Recruitment 2023- Field Engineer Vacancy, Job Opening

Satluj Jal Vidyut Nigam Limited is Recruiting for the Post of Field Engineer, Apply Now!

Sentinel Digital Desk

Satluj Jal Vidyut Nigam Limited has released the latest job notification for the Field Engineer vacancy. Interested candidates can apply before the last date. Check more details on the Satluj Jal Vidyut Nigam Limited 2023 job vacancy.

Satluj Jal Vidyut Nigam Limited Recruitment 2023

Satluj Jal Vidyut Nigam Limited has released an employment notification for the recruitment of Field Engineer Vacancy. More details about the recruitment are provided below:

Satluj Jal Vidyut Nigam Limited job Openings

About Job

Requirement Details

Post Name

Field Engineer

Posts

153

Location

Arunachal Pradesh

Salary

Rs. 60000/-Per Month

Last Date

09-Oct-2023

Age

39 Years

Application Fees

SC/ST/ PWD Candidates: Nil

For Others Candidates: Rs. 600/-

Mode of Payment: Online

Educational Qualification for Satluj Jal Vidyut Nigam Limited Job Opening

Post Name
Educational Qualification

Field Engineer

To apply for the post of Field Engineer at Satluj Jal Vidyut Nigam Limited, the candidate should have completed CA, ICWA, Degree, MBA, Post Graduation Degree from any of the recognized boards or Universities.

How to apply for Satluj Jal Vidyut Nigam Limited Job Vacancy

Interested and eligible candidates can apply Online at SJVN official website sjvn.nic.in, Starting from 18-09-2023 to 09-Oct-2023

Disclaimer: Provided by Satluj Jal Vidyut Nigam Limited

About Satluj Jal Vidyut Nigam Limited: SJVN, formerly known as Satluj Jal Vidyut Nigam, is an Indian public sector undertaking involved in hydroelectric power generation and transmission. It was incorporated in 1988 as Nathpa Jhakri Power Corporation, a joint venture between the Government of India and the Government of Himachal Pradesh. The company has a total operating hydropower capacity of 1912 MW through its two hydropower plants—Nathpa Jhakri and Rampur. In addition, it has an installed capacity of 97.6 MW of wind power and 81.9 MW of solar power.